Production stages
1.
2.
3.
4.
Reinforcement cage manufacturing
Concreting
Steam treatment
Surface preparation for fine finish
Advantages of Formator technology
Reinforcement shell structures are assembled on vertical installations of prepared reinforcement mats, cages, and inserts.
Electrical cables, cut-out switches, and sockets are installed inside the cage. Ready reinforcement cage is loaded and is fixed in the molding machine.
Concrete mix distribution, placement, and consolidation are done there. After placement and consolidation, the concrete mix is kept for 1 hour, then steam is supplied. After finishing of strength gaining, the block is removed from the molding machine and sent for post picking and finishing. 3D-block acquires the shape of a residential building.
Electrical cables, cut-out switches, and sockets are installed inside the cage. Ready reinforcement cage is loaded and is fixed in the molding machine.
Concrete mix distribution, placement, and consolidation are done there. After placement and consolidation, the concrete mix is kept for 1 hour, then steam is supplied. After finishing of strength gaining, the block is removed from the molding machine and sent for post picking and finishing. 3D-block acquires the shape of a residential building.
- Reduced total labor costs
- Unbeatably short deadlines of construction
- Low prime cost
- 3D-block mobility
- Great construction quality
- The versatility of the technology
- Seismic resistance
- Eco-friendly

1 hour Runtime
30 minute Runtime
7 hours The total production time of a block is
18 hours





































Production stages
1.
Reinforcement cage manufacturing
Reinforcement shell structures are assembled on vertical installations of prepared reinforcement mats, cages, and inserts.
Electrical cables, cut-out switches, and sockets are installed inside the cage.
Runtime
1 hour
Electrical cables, cut-out switches, and sockets are installed inside the cage.

1 hour
2.
Concreting
Ready reinforcement cage is loaded and is fixed in the molding machine.
Concrete mix distribution, placement, and consolidation are done there.
Runtime
30 minute
Concrete mix distribution, placement, and consolidation are done there.

30 minute
3.
Steam treatment
After placement and consolidation, the concrete mix is kept for 1 hour, then steam is supplied.
Runtime
7 hours

7 hours
4.
Surface preparation for fine finish
After finishing of strength gaining, the block is removed from the molding machine and sent for post picking and finishing. 3D-block acquires the shape of a residential building.
The total production time of a block is
18 hours

18 hours
















Advantages of Formator technology
- Reduced total labor costs
- Unbeatably short deadlines of construction
- Low prime cost
- 3D-block mobility
- Great construction quality
- The versatility of the technology
- Seismic resistance
- Eco-friendly